Cost of bathroom reno when there is asbestos?


Redchick

Recommended Posts

Hi, have to get my bathroom renovated and it has asbestos sheeting involved. Any one have an indication of what it will add to the cost of the reno? It is a very small bathroom - only a bath and basin.


TIA


RC

Link to comment
Share on other sites

  • Replies 11
  • Created
  • Last Reply

Top Posters In This Topic

  • Bethlehem

    4

  • Redchick

    2

  • Basil

    2

  • Jersey Caramel

    1

Top Posters In This Topic

If you’re resheeting anyway, the cost difference between removing regular sheeting and asbestos sheeting isn’t too much for experienced contractors.


Disposable PPE, disposable plastic sheeting to create a ‘sealed’ room, plastic to wrap the sheeting up, negative pressure air filters, sprinkler systems etc are all equipment an experienced asbestos removing contractor should have. I think there’s an extra charge for disposing of asbestos because it can not go into regular landfilll.


I would hazard a guess it would be a few hundred extra considering removing asbestos from a whole house was about $6-10k (different houses). The expense is having to resheet and repaint everything.

Link to comment
Share on other sites

In nsw you will need a licensed asbestos removalist & an inspection by an appropriately qualified person.


The inspections are usually around $1500. Removalist depends on volume and how much it costs to dispose of it legally.

Link to comment
Share on other sites

Jersey Caramel

We recently had our bathroom renovated and although we didn't have asbestos, if they found it they estimated the extra cost would be in the order of $1,500-$2,000 (from memory).

Link to comment
Share on other sites

If there's not a huge amount of asbestos you should be able to get rid of it at the local tip - we do this every so often as old asbestos sometimes turns up in the backyard. Our NSW Council run tip has a skip bin where residents can deposit small amounts of asbestos wrapped in thick plastic for not a huge amount of money.

Link to comment
Share on other sites

If there's not a huge amount of asbestos you should be able to get rid of it at the local tip - we do this every so often as old asbestos sometimes turns up in the backyard. Our NSW Council run tip has a skip bin where residents can deposit small amounts of asbestos wrapped in thick plastic for not a huge amount of money.

 

<10m2.

Link to comment
Share on other sites

In nsw you will need a licensed asbestos removalist & an inspection by an appropriately qualified person.


The inspections are usually around $1500. Removalist depends on volume and how much it costs to dispose of it legally.

In Qld, it has to be removed by a licensed asbestos removalists as well. The license is not difficult to obtain and many builders have someone qualified to do so on their crew.


The post removal inspection is by a government certified inspector and I don’t remember it being a separate cost.


I remember the cost of having asbestos inspection (prior to removal) and testing to be around $1500. A friend had it done recently when their neighbors illegally removed asbestos sheeting without precautions. She has her property tested for fibres and sued them for the cost of remediation.

Link to comment
Share on other sites

Seayork2002

In nsw you will need a licensed asbestos removalist & an inspection by an appropriately qualified person.


The inspections are usually around $1500. Removalist depends on volume and how much it costs to dispose of it legally.

 

You worded it better than I was going to, but yes this exactly

Link to comment
Share on other sites

Thanks everyone. Interestingly, my inspector said they were not allowed to remove asbestos or recommend anyone as it could be a conflict of interest ie they could say there was asbestos where there wasn’t to make more money. Sounds like the reno i company I use should be able to handle it.

Link to comment
Share on other sites

Yes that’s true.

Asbestos assessor are independent and have their own duty of care. They will assess for asbestos and check that it’s been removed correctly. Sometimes this means multiple visits. It also means that then they will charge more for multiple visits. Which means the removalist is motivated to do it right the first time!


Check and ask the Reno company for a copy of the insurance and clearance certificate at the end of the job. They should be readily able to provide them.

Link to comment
Share on other sites

Advertisement

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...